Teckentrup Steel Doors for Crossrail at Farringdon Station

Teckentrup has completed installation of its doors with Crossrail at Farringdon station and is entering the maintenance phase. It’s a truly impressive project to have been part of. 

In anticipation of the stations opening, Crossrail has released a 3D tour of the station, which is amazing to explore, and a video for a glimpse of our doors in situ!

Watch the video here!


Further reading

Teckentrup Social Post 2024 Wicket Door Installation Video V2

Wicket Door Installation - Industrial Sectional Doors

02 May 2024

Watch how to install a wicket door on a Teckentrup industrial sectional door step by step.

Read more

Teckentrup TV Wicket Door industrial Sectional Install Videos

Wicket Door Multi-Point Locking Installation - Industrial Sectional Doors

01 May 2024

Watch how to install multi-point locking on a Teckentrup industrial sectional wicket door step by step.

Read more

Teckentrup Car Teck Insulated Side Hinged Garage Door 3 Part Threshold Thumb

Toolbox Tip - Side Hinged 3-Part Threshold Packing

23 Apr 2024

“How can I mitigate against pooling and ingress when fitting a CarTeck side hinged garage door 3-part threshold on a level surface?” We have an easy solution when fitting...

Read more